Stevedoring
Efficient Unloading of MV RED DIAMOND with the Truck Lossing Method

MV RED DIAMOND was unloaded by truck lossing: cargo went straight from the ship’s hold onto trucks, without being stored in a warehouse or stacking yard, so it reached its destination faster.
Stevedoring for the vessel MV RED DIAMOND was carried out using the truck lossing method: cargo is moved directly from the ship’s hold onto trucks, without first being stored in a warehouse or a stacking yard. This way of working was chosen to cut out double handling, so goods move from the port to their final destination much faster.
The success of truck lossing on MV RED DIAMOND depends heavily on matching the lifting speed of the ship’s cranes with the number of trucks available on the quay. If truck movements stall, discharging on board stops as well, and the ship risks staying longer at berth.
To keep operations at a steady pace, the field team takes carefully measured coordination steps:
- Strict control of the truck queue on the first line of the quay, so that a replacement truck is always ready right under the crane as soon as the previous one has been loaded.
- Tally clerks and quay supervisors on site to record the tonnage and quantity of cargo as it moves from the hold to the trucks.
- Coordinated truck departure schedules so that loaded trucks leaving for the receiving warehouse and empty trucks returning to the port stay in balance.
With well-coordinated truck lossing, the loading and unloading of MV RED DIAMOND kept storage costs down and shortened the ship’s time in port.